What can you build in Arendonk?
What you can build in Arendonk depends on the plan that covers your plot – the regional zoning plan (gewestplan), a spatial implementation plan (RUP) or a special development plan (BPA) – and on 9 planning regulations: 3 from Arendonk itself and 6 from the Flemish Region. The register lists 13 plans for Arendonk.
At a glance
| Province | Antwerp |
|---|---|
| Plans in the register | 13 (RUPs, BPAs and others) |
| Municipal regulations | 3; most recent: ‘Afbakening kernwinkelgebied en detailhandel’ (adopted on 9 April 2018, Belgian Official Gazette 18 June 2018) |
| Provincial regulations | none |
| Regional regulations | 6, as everywhere in Flanders |
| All plans in the register | yes, according to the municipality |
Find out for free what you can build on your plot in Arendonk
How much can I build in Arendonk?
That depends on the plot: the zoning plan that applies (the regional zoning plan, a RUP or a BPA), the regulations and what is there now. The Perceelscan works it out for each address: how many m² of floor area may legally be built, and how many are already built.
Do I need an environmental permit in Arendonk?
For most works, yes: building, renovating, demolishing and splitting a dwelling generally require an environmental permit (omgevingsvergunning, formerly called the building permit or planning permit), which you apply for through the Omgevingsloket portal. Some minor works are exempt or only require a notification: vlaanderen.be sets out the rules. For each address, the Perceelscan also shows the existing permits.
Can I demolish and rebuild in Arendonk?
Demolition usually requires an environmental permit. What you may build afterwards is determined by the plan and the regulations that apply to the plot; heritage status, a plan in preparation or an expropriation can stand in the way. The Perceelscan sets it all out for each address.
Can I split a dwelling into several units in Arendonk?
In Arendonk, the regulation ‘Oppervlaktenormen voor meergezinswoningen’ applies to this. For each address, the Perceelscan tells you which regulations apply to the plot. Splitting a dwelling into several dwellings generally requires an environmental permit, even without any building works (see splitting a dwelling on vlaanderen.be).
How many parking spaces must I provide in Arendonk?
In Arendonk, the regulation ‘Parkeren en stallen van auto's en fietsen en realisatie van bergruimte bij woningen en andere functies’ determines how many car and bicycle parking spaces a project must provide; this depends on the number of dwellings or the floor area.
Do I need to install a rainwater tank in Arendonk?
Often, yes, when you build, rebuild or extend a building or a paved surface: the regional regulation on rainwater (2023) then sets rules for collecting and reusing rainwater, letting it soak into the ground or buffering it. Which measure your project requires depends on its surface area.
Where can I find the spatial implementation plans (RUPs) for Arendonk?
In the register of plans and regulations (DSI) of the Departement Omgeving, with 13 plans for Arendonk (RUPs, BPAs and others). Where no RUP or BPA applies, the regional zoning plan (gewestplan) determines the zoning. For each plot, the Perceelscan names the plan that applies, with the zone and a link to its provisions.
The planning regulations of Arendonk
| Afbakening kernwinkelgebied en detailhandel | adopted on 9 April 2018, Belgian Official Gazette 18 June 2018 |
|---|---|
| Parkeren en stallen van auto's en fietsen en realisatie van bergruimte bij woningen en andere functies | approved on 3 September 2015, Belgian Official Gazette 24 September 2015 |
| Oppervlaktenormen voor meergezinswoningen | approved on 20 August 2015, Belgian Official Gazette 24 September 2015 |
What applies throughout Flanders
What the Perceelscan checks for each plot in Arendonk
- The plan that applies: a municipal, provincial or regional RUP, a BPA, an APA or the regional zoning plan, with the zone and a link to its provisions.
- The regulations that apply to that plot: a regulation may also apply to only part of the municipality.
- How many m² of floor area may legally be built, and how many are already built.
- Plans and regulations in preparation, and expropriation plans.
- Heritage: protection, the established inventory and archaeological zones.
- Flood risk (P-score and G-score), signal areas (signaalgebieden) and PFAS zones.
- Right of pre-emption, nature, Seveso sites and sewerage in the street.
- Environmental permits on the plot and next door.
Find out for free what you can build on your plot in Arendonk
Building near Arendonk
- What can you build in Oud-Turnhout?
- What can you build in Retie?
- What can you build in Ravels?
- What can you build in Turnhout?
- What can you build in Dessel?
- What can you build in Mol?
Source: DSI, the register of plans and regulations of the Departement Omgeving, retrieved on 5 October 2026. Each regulation’s record contains its full text.
Updated on