What can you build in Eeklo?
What you can build in Eeklo depends on the plan that covers your plot – the regional zoning plan (gewestplan), a spatial implementation plan (RUP) or a special development plan (BPA) – and on 9 planning regulations: 2 from Eeklo itself, 1 from the province of East Flanders and 6 from the Flemish Region. The register lists 25 plans for Eeklo.
At a glance
| Province | East Flanders |
|---|---|
| Plans in the register | 25 (RUPs, BPAs and others) |
| Municipal regulations | 2; most recent: ‘Gemeentelijke stedenbouwkundige verordening met oog op het versterken van de woonkwaliteit in Eeklo’ (approved on 20 December 2012) |
| Provincial regulations | 1 |
| Regional regulations | 6, as everywhere in Flanders |
| All plans in the register | yes, according to the municipality |
Find out for free what you can build on your plot in Eeklo
How much can I build in Eeklo?
That depends on the plot: the zoning plan that applies (the regional zoning plan, a RUP or a BPA), the regulations and what is there now. The Perceelscan works it out for each address: how many m² of floor area may legally be built, and how many are already built.
Do I need an environmental permit in Eeklo?
For most works, yes: building, renovating, demolishing and splitting a dwelling generally require an environmental permit (omgevingsvergunning, formerly called the building permit or planning permit), which you apply for through the Omgevingsloket portal. Some minor works are exempt or only require a notification: vlaanderen.be sets out the rules. For each address, the Perceelscan also shows the existing permits.
Can I demolish and rebuild in Eeklo?
Demolition usually requires an environmental permit. What you may build afterwards is determined by the plan and the regulations that apply to the plot; heritage status, a plan in preparation or an expropriation can stand in the way. The Perceelscan sets it all out for each address.
Can I split a dwelling into several units in Eeklo?
In Eeklo, the regulation ‘Gemeentelijke stedenbouwkundige verordening met oog op het versterken van de woonkwaliteit in Eeklo’ applies to this. For each address, the Perceelscan tells you which regulations apply to the plot. Splitting a dwelling into several dwellings generally requires an environmental permit, even without any building works (see splitting a dwelling on vlaanderen.be).
How many parking spaces must I provide in Eeklo?
For Eeklo, the register lists no municipal regulation on parking; the plan and the regional rules then apply, and the permitting authority decides on a case-by-case basis.
Do I need to install a rainwater tank in Eeklo?
Often, yes, when you build, rebuild or extend a building or a paved surface: the regional regulation on rainwater (2023) then sets rules for collecting and reusing rainwater, letting it soak into the ground or buffering it. Which measure your project requires depends on its surface area. Eeklo has its own rules on water in the regulation ‘Gemeentelijke stedenbouwkundige verordening met betrekking tot het overwelven van baangrachten’.
Where can I find the spatial implementation plans (RUPs) for Eeklo?
In the register of plans and regulations (DSI) of the Departement Omgeving, with 25 plans for Eeklo (RUPs, BPAs and others). Where no RUP or BPA applies, the regional zoning plan (gewestplan) determines the zoning. For each plot, the Perceelscan names the plan that applies, with the zone and a link to its provisions.
The planning regulations of Eeklo
| Gemeentelijke stedenbouwkundige verordening met oog op het versterken van de woonkwaliteit in Eeklo | approved on 20 December 2012 |
|---|---|
| Gemeentelijke stedenbouwkundige verordening met betrekking tot het overwelven van baangrachten | adopted on 19 December 2002 |
Provincial regulations (East Flanders)
| Provinciale stedenbouwkundige verordening Weekendverblijven en openluchtrecreatieve terreinen | approved on 13 July 2015, Belgian Official Gazette 12 August 2015 |
|---|
What applies throughout Flanders
What the Perceelscan checks for each plot in Eeklo
- The plan that applies: a municipal, provincial or regional RUP, a BPA, an APA or the regional zoning plan, with the zone and a link to its provisions.
- The regulations that apply to that plot: a regulation may also apply to only part of the municipality.
- How many m² of floor area may legally be built, and how many are already built.
- Plans and regulations in preparation, and expropriation plans.
- Heritage: protection, the established inventory and archaeological zones.
- Flood risk (P-score and G-score), signal areas (signaalgebieden) and PFAS zones.
- Right of pre-emption, nature, Seveso sites and sewerage in the street.
- Environmental permits on the plot and next door.
Find out for free what you can build on your plot in Eeklo
Building near Eeklo
- What can you build in Kaprijke?
- What can you build in Sint-Laureins?
- What can you build in Lievegem?
- What can you build in Maldegem?
- What can you build in Assenede?
- What can you build in Evergem?
Source: DSI, the register of plans and regulations of the Departement Omgeving, retrieved on 5 October 2026. Each regulation’s record contains its full text.
Updated on