Skip to content
TerraFactPerceelscanFind an address

What do the Walloon terms in a contract or deed mean?

Anyone buying in Wallonia reads the documents in French: the planning information, the soil extract, the preliminary contract. Below are the terms that recur, in alphabetical order, with what they mean and a link to the guide that covers them. The exact meaning of a term is set by law; this list helps you read the documents.

The terms

TermWhat it meansMore
Aléa d'inondationThe flood hazard on the 2021 map, from very low to high.guide
Autorisation patrimonialeThe heritage authorisation that any work on a listed property requires beforehand.guide
AWaPAgence wallonne du Patrimoine: the regional heritage administration.guide
BDESBanque de données de l’état des sols: the soil database, plot by plot.guide
Bien classéA listed property: monument, ensemble, site or archaeological site under protection.guide
Certificat d'urbanisme n° 1What applies to a plot: zone, plans, perimeters and risks.guide
Certificat d'urbanisme n° 2An assessment of a specific project, valid for two years.guide
Certificat PEBThe energy certificate of a home, from A++ to G.guide
CoDTCode du Développement Territorial: the Walloon spatial planning code, since 1 June 2017.guide
CoPatCode wallon du Patrimoine: the Walloon Heritage Code, since 1 June 2024.guide
DérogationA departure from the plan de secteur or from a standard, only in the cases the CoDT lists.guide
Droit de préemptionThe right of a public body to buy first within a perimeter.guide
DRIGMThe SPW department for subsoil risks: mines, quarries and karst.guide
ÉcartA justified departure from an indicative document, such as a SOL or a guide.guide
Extrait conformeThe BDES extract the seller passes on at every transfer.guide
Fonctionnaire déléguéThe regional official who advises on permits, or grants them himself.guide
Guide régional d'urbanismeThe regional guide; its standards bind, its indications give direction.guide
Guide communal d'urbanismeThe municipal guide, indicative only.guide
Impact limitéWorks that need a permit, but with a lighter procedure.guide
PastilleThe mark of special heritage value for a property in the inventory.guide
Permis d'urbanisationFormerly permis de lotir: the permit to divide land into building plots for homes.guide
Permis d'urbanismeThe planning permit to build, alter or demolish.guide
Plan de secteurThe regional zoning plan: the binding designated use of every plot in Wallonia.guide
RGBSRThe rules for building in a rural village, part of the regional guide.guide
SARSite à réaménager: a disused business site the Region wants to redevelop.guide
SDCSchéma de développement communal: the municipality’s direction for its whole territory.guide
SOLSchéma d’orientation local: the indicative plan for a neighbourhood, formerly a PCA or RUE.guide
ZACCZone d’aménagement communal concerté: a reserve zone, buildable only once the municipality opens it.guide
Zone de protectionThe zone around a listed property that protects the views of it.guide

A purchase involves other points too, such as who provides which information on a plot and registration duties by region. What a report on an address costs is listed under Perceelscan pricing. You can work out the taxes on a purchase for free with the registration duties calculator and the property tax calculator.

Abbreviations in a deed

Notaries often use abbreviations: CU1 and CU2 for the planning certificates, PU for a permis d’urbanisme, SPW for the Service public de Wallonie, the regional administration, and CPAS for the public social welfare centre. A PCA, RUE or schéma directeur in an old deed now counts as a SOL; a permis de lotir as a permis d’urbanisation.

In the other regions

Sources

Check it for your address

Updated on